Seplat East Onshore Limited commissioned Cainergy International Limited to deliver the construction of its camp site with block wall fencing for the Owu 1 Project in Imo State, Nigeria. The project is aimed at delivering the construction of the block wall in a safe, timely, and quality manner, ensuring all safety protocols are adhered to.

SEPLAT EAST is a private limited company engaged in the oil and gas exploration and production business in Nigeria.

Cainergy would be responsible for mobilizing adequate resources, which include equipment, personnel, and materials. With our team of HSE officers and engineers offering quality control and laboratory testing services, earthworks, base preparation and earthworks, construction of perimeter drains and evacuation pits, and a block wall fence.

At Cainergy, we have always shown a commitment to delivering beyond our clients’ expectations. This remains our major priority, which sets us apart. The Kickoff meeting was held at the Seplat Owerri office, with both parties in attendance, with the assurance that they would meet and exceed the project objectives and client expectations.Shortly after, our team familiarized themselves with the OWU community in a community FTO meeting.

After the completion of Milestone One, which included the mobilization of the equipment, personnel, and materials, which included setting up a standard site office, manning of security personnel, quality control, laboratory testing services, e.t.c. The team proceeded with the construction works, which included site preparations and earthworks, base preparations and asphalting of the location, construction of perimeter drains, construction of evacuation pits at the camp, construction of generators and diesel slabs, which constituted Milestone Two. The final phase of the project includes the fabrication and installation of a double-leaf steel pipe gate and the supply of high-yield steel reinforcement bars e.t.c.

As the team gears towards demobilization, this was achieved with the continuous support of the SEPLAT team and the relentless effort of the Cainergy project team and their strive towards being driven to deliver the Owu Project within record time.

Our commitment to achieving the project objectives is driven by our core business values (Innovation, Quality, Sustainability, Mutual Respect, Safety, Ethic, and Client Focused).

Cainergy has specified a list of success factors for meeting the objectives of this project, and we are committed to abiding by these success factors to ensure the project objectives are met.

For more updates on this project, please stay connected to our page.